Projects
OUR CLIENTS SAY IT BEST, SO WHY NOT HEAR WHAT THEY SAID.
“We have recently completed a building strengthening project which required a significant number of additional piles installed from within the building to a depth of 25m. There were numerous physical constraints with limited head room and working space which significantly impacted the installation methodology. We involved Revex early in the process to ensure that the physical constraints of the site were accounted for in the design of the pile solution, and a workable methodology was established from the start. End result was a very successful execution of a complex installation with absolutely no issues, which is a great compliment to the Revex team and their design and install process.”
jason allport,
engineering manager
“Rodney and the Revex Piling team were instrumental in the ACF project at the Frucor Wiri Site. They teamed up with Cassidy Construction to deliver a significant piece of work that includes a large number of deep piles. The site had significant challenges with unidentified underground services and being a live operational site, this team needed to plan and navigate well. Revex has an understanding of this site, and they have delivered good outcomes with previous projects. I would suggest they would be a good asset for future works on the Wiri site.”
Anton venter,
Frucor Suntory Project Support & Capital Programme Manager
“Revex were easy and efficient to work with, the required documentation was turned around quickly for our ambitious timelines, communication around delivery was clear, honest and accurate. They were helpful with advice, cost engineering and general problem solving. Revex helped make the design and consent stage of the project both simple and quick, Council was suitably impressed and RFI’s weren’t an issue.
To my knowledge Revex were on programme on site and variations were limited to factors outside of their control and were communicated well, the variations we experienced were due to poor ground loading and Revex had solutions to this that were implemented quickly and cost effectively.
I would recommend Revex and will be using them again when the project calls for it.”
Dillon towers,
Development Manager GibbonsCo
“Southbase partnered with Revex to provide an IL4 piling solution that met an extremely fast programme for a major data centre. The same level of professionalism and technical expertise that Revex offered in the design phase is now being seen in the construction phase where we are ahead of programme with exceptional quality and safety standards being met. Revex are now our preferred piling partner and are involved on numerous projects we have across the North Island.”
Paul Henderson,
North Island Regional Manager, Southbase Construction
“In terms of Revex performance, it would be a fair comment to say it was faultless. From initial contact to request involvement in the project, lead-in to the project, identifying issues with the design which had been overlooked, and then working in with my client, it was second to none. In terms of site work… reports from my staff were excellent. The guys were punctual and in the correct PPE. The work was completed ahead of time and on budget, in a safe manner and under time constraints out of their control. The variations submitted were detailed and valid and made it easy for approval with the client which isn’t often the case. It has been a pleasure…will certainly keep in touch for future work and suggest Revex for future Fonterra projects.”
James Cullen,
Owner, Cullen Building
“Revex assisted me on a recent $40M civil tender submission – where they tabled an alternative design that offered significant cost savings.
I have also been working with them onsite for a School Project which has required some very demanding safety and operational constraints due to the proximity of the work to a live school environment and adjacent in-ground services.
I have found the Revex team to be professional in every respect and would recommend them to any client.”
Grant GedYe,
PROJECT MANAGER, Hawkins
“I have enjoyed a solid working relationship with Mike, Rodney and Glen for many years; they are always helpful, pragmatic and willing… On a recent project, Revex worked through three different complex pile arrangements with estimates ranging between $850,000 to $1,600,000, which enabled BGT to design the best overall structure. Revex also provided comprehensive guidance on programme, procurement and critical risks - which was appreciated by the client. The Revex company values align well with our own and we see them as a ‘go-to’.”
Karl Dawe,
Director, BGT Structures
“ENGEO have recently been involved with a data centre project for a key national client of ours. The ground conditions leant itself to a screw pile solution and we had no hesitation in recommending our client engage with the REVEX Team having worked closely on successful projects with Rodney and Mike in the past.
The response was nothing short of fantastic with a very proactive and timely approach to support upfront programme, procurement and ECI advice to allow the team to move seamlessly through optioneering and evaluation. Mike and Glen again showed themselves to be experts in their field through the design and screw pile construction phases of the project keeping the team well informed and up to date and delivering ahead of schedule.
From a consultant’s point of view REVEX are an absolute pleasure to work with as they engage closely with us to collaboratively solve any design and constructability issues associated with the ground model and geotechnical risks present on site. Having a contractor who understands consulting and works to support best for project solutions is a key factor in setting the project up for success and REVEX are one of the best!
I would not hesitate in recommending REVEX to support your next job..”
David Brodie,
Associate, ENGEO
“We have been working with Revex Piling since the start of the year. Revex’s response to queries for input into our Prelim and Developed design has always been rapid and effective. They highlighted how their system and experience could improve our project’s constructability and worked collaboratively with Tū Tika and the wider project team to value engineer the piling scope from 235 piles down to 129 piles. Rodney’s knowledge of procurement has enabled us to start planning the construction programme, while Mike’s knowledge of pile performance has helped us shape the building’s lateral performance. We look forward to using them again.”
JADEN WHIUNUI,
OWNER, TŪ TIKA CONSULTING ENGINEERS
“Revex worked with us recently on a multi-story apartment project with challenging site conditions. They were brought in early so that we could gain the benefit of both their technical expertise and their knowledge of market conditions. They provided the technical input we needed when developing the building design and were very knowledgeable and responsive… the collaboration and value engineering helped Blueprint to reduce overall scope from 180 driven piles down to 110 screw piles, resulting in significant savings for the client. I will definitely encourage clients to consider Revex for future projects.”
Richard Gardiner,
Technical Director Structural Engineering, Blueprint
“Revex Piling Limited were engaged in an early involvement basis for a complex IL4 structure in South Auckland. I was impressed with Mike's ability to understand the structural requirements and provide sound advice on the foundation design. Revex’s approach to achieving the lateral shear resistance was innovative; a difficult undertaking with a very heavy building requiring IL4 performance.
Having Revex as part of the design team kept the foundation design efficient and avoided any disruption or discontinuity between design and construction phases.
I would highly recommend ECI with Revex Piling for future projects.”
Telma Pinto Santos, Technical ManageR
“I have seen a lot, but this was my first time with screw piling and it was unbelievable. They said “come and watch the first one”, but six piles later, I was impressed!
Doing business with Revex was a delight; very informative and I never had to wait for a reply. Nothing was a problem for the site team; with a pre-start every day, I was told what they were doing and they got on with it safely and professionally, even through pouring rain. Even thought one or two piles were out on QA but they went back to Beca and got it sorted - and they still came in under time and budget.
You guys make it look simple!”
Bryce Cook,
Site Manager, Ballance
“Recently, we engaged Revex Piling to install 91 screw piles on a secondary school gym project. From the tender stage Rodney made multiple suggestions and highlighted important information that was required for the project. Where there was information lacking, they highlighted this to us so we can get the correct information to progress the project. After we were successful with the tender, Rodney & Mike continued to help us work through the design phase before they were engaged under a subcontract agreement. Mike continued to work with us on the planning and set up, and Rodney called weekly to check that everything was going to plan. All this work… ensured a smooth installation. Revex met every milestone and Justin and his team were nothing but professional and punctual, knowledgeable and efficient onsite. I am yet to meet a subcontractor as tidy as the team from Revex and the majority of their Piles were within 10mm of the surveyed marks. I would love the opportunity to work with Revex Piling again in the future and highly recommend them to any Main Contractor who has screw piling in their upcoming project.”
Andrew Boshra,
Project Manager, Focus Construction Group
“The job was small but technical. We watched the job but Revex had it under control. The guys that came out were brilliant and the execution on site was perfect – I couldn’t fault it. Senior Leadership was on site, and it felt good knowing the top guys were dealing with the it. Although there was a delay with pipe, Revex were upfront about it and came back to us with solutions to get things across the line. It made for a no hassles, smooth offering.”